Solar panel packaging information and process(4)

- Jan 11, 2019-

laminated


4.1 Preparation:

Start up, check whether the parameters of the laminating machine meet the process requirements: heating temperature: 125 ° C ~ 140 ° C; pressurization time: 120 sec? ~ 180 sec (lamination timing); heating time: 200 sec? ~ 280 sec (vacuum timing); Venting time: 20sec?~40sec (deflation timing); heating vacuum: ≤-0。1Mpa。 The above parameters are used in the "non-lamination and one cure" process。 Check if the vacuum pump is working properly, whether the vacuum is normal, and whether the water valve is open。 Check the PTFE cloth used。 If there is any residue on the surface, clean it。 Check the upper and lower surfaces of the laminator。 The residual material is removed clean。

The upper cover of the laminator was opened, and the temperature of the hot plate of the laminator was tested with an AZ8801 thermometer, and the number of test points per time was not less than 6 points。 The hot plate test temperature should meet the process specifications, and the temperature error of each point on the whole hot plate should be ≤ 8 °C, and the recording work should be done。 If the temperature error meets the standard, the lamination can be started。 If the temperature error does not conform to the standard, it should be reported to the production department in time and processed according to relevant regulations。


4.2 Overview of the work:

The laminated assembly is laminated and packaged.


4.3 Lamination process

Press the “Auto/heat” button first to heat the inside of the laminator. After the hot plate temperature reaches the set temperature and stabilize, press the “up” button to open the upper cover, and then press the “feed” button. Do not load the part to be laminated, wait until it moves to the lamination area (if you can adjust the displacement switch manually to adjust it), press the “Down” button, there will be a “safety” prompt, all The person (except the operator) is not allowed to stay in the lamination area at this time. Press the "confirm" button of the prompt to lower the top cover of the laminator. After the lamination process is finished, the upper cover will automatically open, and the PTFE cloth in the laminated part will be automatically sent out (if it is sucked up by the upper cover, it should be pulled out manually. Then the laminator will be run again in the same way. At this point, the whole equipment has been stabilized and can be laminated normally. The feeding should be carried out in an orderly manner. The PTFE cloth should completely cover the components, and the lamination process should be carried out according to the previous requirements. Note that when discharging, due to component comparison Large, the force transmitted may not be enough, the hand should help pull down.


4。4 Quality requirements:

1The glass does not allow the matte side to face up; there is no obvious offset between the back film and the EVA edge。 (before lamination)

2 There are no air bubbles, obvious foreign objects and debris inside the module。 (after lamination)

3 There is no misalignment and splicing between the cells; the back film must cover the entire glass。 (after lamination)

image

4.5 Notes:

1 PTFE cloth should be kept clean, especially the residue of EVA glue should not be left on the surface; if there is EVA glue or other dirt on the back of the laminated component, it should be removed in time。

2 Do not push the components arbitrarily before lamination, to prevent the stack from shifting.

3 The operator shall monitor the vacuum degree of the upper and lower chambers after the components enter the laminating machine. If the vacuum degree does not match the set vacuum, the laminating machine shall be suspended, and the abnormal situation shall be recorded and reflected in time. Leader of the production department or relevant personnel of the Ministry of Protection.

4 If the temperature of the hot plate is abnormal (more than 5 °C above the set temperature), the laminator should be suspended, the abnormal situation should be recorded, and promptly responded to the production department leader or the relevant personnel of the Ministry of Protection。

5 If the laminated component is found to have bubbles for three consecutive times, the laminating machine should be suspended, and the abnormal situation should be recorded and promptly reflected to the production department leader or the relevant personnel of the Ministry of Protection.